Friday, December 11, 2020

The Rear Section.

 

The rear section got the makeover first. All the structure now fixed, railings, pillars etc glued.


The bottom outside walk walk.


First floor veranda.

Stairway with dragon and phenix window.


Fourth bedroom.

No comments:

Post a Comment