Showing posts with label BandW Refurbish. Show all posts
Showing posts with label BandW Refurbish. Show all posts

Saturday, January 2, 2021

Front Section

 


Front refurbished. Everything glued.


Still having punch.


View along top balcony


View through side door of the Blue Lady


Main bedroom.


Top of the stairs.

Friday, December 11, 2020

The Rear Section.

 

The rear section got the makeover first. All the structure now fixed, railings, pillars etc glued.


The bottom outside walk walk.


First floor veranda.

Stairway with dragon and phenix window.


Fourth bedroom.